Chatham County, GA Stormwater Regulations

Chatham County operates under a Phase I Medium MS4 NPDES permit, making it the largest and most regulated coastal MS4 in Georgia. The City of Savannah drives most stormwater activity in the county. Tidal ranges exceeding 9 feet create severe drainage challenges. GA EPD penalties reach $50,000 per day for violations.

verified Last verified: March 2026

Primary source: Georgia Environmental Protection Division (EPD) Watershed Protection Branch

Quick Reference

Category Details
Regulatory Authority GA EPD (state), City of Savannah Stormwater Management (local), Chatham County Engineering (local), GA DNR Coastal Resources Division (coastal)
MS4 Status Phase I Medium MS4 (largest Georgia coastal MS4)
Permit Required 1 acre+ disturbance requires NPDES permit + local Land Disturbance Permit. Local thresholds may be lower
Inspection Frequency Construction: every 7 days + after 0.5" rain. Post-construction: annual. MS4 outfall monitoring required
Penalty Range State: up to $50,000/day (GA EPD). Local: fines, stop-work, permit revocation
Coastal Designation Yes. Fully within GA DNR CMPA. Tybee Island, Wilmington Island, extensive tidal marsh system
Key Municipalities City of Savannah, Pooler, Garden City, Tybee Island, Bloomingdale, Thunderbolt

Permit Requirements

Chatham County's Phase I MS4 status imposes the most detailed stormwater permit requirements of any coastal Georgia county. The state NPDES Construction General Permit (GAR100002) applies to land disturbance of one acre or more. The City of Savannah and Chatham County may have local thresholds that require stormwater review for smaller projects.

Georgia's GSWCC certification requirements are strictly enforced in the Savannah metro area. Level II Certified Personnel must be present on permitted sites, and Level IB Certified Inspectors must conduct regular inspections. The volume of development in Pooler, west Chatham, and the I-16/I-95 corridor generates high demand for certified personnel.

The GA DNR Coastal Management Program Area covers all of Chatham County. Coastal Marshlands Permits are required for work affecting tidal marshes, which are extensive throughout the county. The Savannah River, its tributaries, and the interconnected tidal creek system that threads through Chatham County all fall under coastal jurisdiction.

Inspection Obligations

Construction site inspections follow the standard Georgia schedule: every seven days and within 24 hours of 0.5-inch rain events. Given Chatham County's Phase I MS4 status, both city and county inspectors actively monitor construction sites in addition to the required self-inspections.

The Phase I MS4 permit requires outfall monitoring, water quality sampling, and detailed record-keeping that Phase II communities don't face. The City of Savannah's stormwater management department conducts systematic monitoring of the storm sewer system, including dry-weather screening for illicit discharges.

Post-construction BMPs must be inspected annually by the responsible party. The City of Savannah maintains an extensive inventory of permitted stormwater facilities and conducts compliance inspections. HOAs, commercial property owners, and institutional facilities are all subject to BMP maintenance inspections.

Penalty Structure

GA EPD can impose civil penalties up to $50,000 per day per violation under the Georgia Water Quality Control Act. The higher enforcement activity in Chatham County, driven by the Phase I MS4 permit and development volume, means violations receive more attention than in rural coastal counties.

The City of Savannah enforces its stormwater ordinance aggressively, with dedicated enforcement staff who issue notices of violation, stop-work orders, and fines. The city can revoke land disturbance permits, withhold certificates of occupancy, and require corrective action plans for non-compliant sites.

Chatham County's unincorporated areas fall under county enforcement. The county engineering department reviews development plans and inspects construction sites. GA DNR's Coastal Resources Division handles violations of the Marshlands Protection Act and Shore Protection Act within the coastal zone.

Key BMPs

Chatham County's extreme tidal range, flat topography, and high water table make BMP design particularly challenging:

  • Wet detention ponds with tide gates - Standard for larger developments. Must account for 7-9 foot tidal range at outfall structures. Tide gates prevent tidal backflow from flooding pond systems.
  • Pump station-assisted drainage - Required in low-lying areas where gravity drainage isn't feasible during high tide. Common in historic Savannah and barrier island communities.
  • Bioretention with underdrains - Necessary due to high water tables. Standard infiltration designs fail in Chatham County's saturated soils.
  • Constructed wetlands - Complement the natural tidal marsh environment. Provide excellent water quality treatment when designed for coastal conditions.
  • Permeable pavement - Used in commercial areas and parking lots, particularly in Pooler and west Chatham. Must account for high groundwater conditions.

Local Ordinances

The City of Savannah's stormwater management ordinance is the most detailed in coastal Georgia, reflecting the requirements of the Phase I MS4 permit. The ordinance covers all aspects of stormwater management, from construction-phase erosion control to post-construction BMP maintenance, illicit discharge prohibition, and industrial facility inspection.

The City of Savannah operates a stormwater utility funded by fees assessed on developed properties. Revenue supports drainage infrastructure maintenance, flood control projects, water quality monitoring, and regulatory compliance activities. The utility has invested heavily in pump stations, tide gates, and drainage system improvements to combat chronic tidal flooding.

Pooler has emerged as one of the fastest-growing cities in Georgia, generating significant stormwater permitting activity. The city's development standards require stormwater management for new commercial and residential projects, coordinated with Chatham County's MS4 program.

Chatham County Stormwater FAQs

Why does Chatham County have a Phase I MS4 permit instead of Phase II? expand_more
Chatham County, through the City of Savannah and the Metropolitan Planning Commission area, qualifies as a medium-sized MS4 with a population exceeding 100,000 in the urbanized area. Phase I MS4 permits apply to municipalities with populations over 100,000, while Phase II applies to smaller urbanized areas. The Phase I permit carries more detailed requirements for monitoring, reporting, and pollution reduction, making it the most stringent MS4 program on Georgia's coast.
What is the land disturbance threshold for stormwater permits in Chatham County? expand_more
Georgia's statewide threshold is one acre of land disturbance for NPDES permit coverage from GA EPD. However, the City of Savannah and Chatham County have local requirements that may apply to smaller projects. The Savannah-Chatham Metropolitan Planning Commission reviews development plans for stormwater compliance, and local ordinances may require stormwater management for projects below the one-acre state threshold within the urbanized area.
How do tidal conditions in Savannah affect stormwater management? expand_more
Savannah experiences some of the highest tidal ranges on the Southeast coast, with a mean tidal range of about 7 feet and spring tides exceeding 9 feet. This dramatically affects stormwater system design and performance. Outfall structures must account for tidal backwater, drainage systems have reduced capacity during high tides, and coastal flooding from king tides can overwhelm stormwater infrastructure. Chatham County's stormwater systems must be engineered for these extreme tidal conditions.

Ready for a site that thrives?

AUE Land provides BMP inspections, erosion control, and drainage services throughout the Savannah metro area. We understand Chatham County's tidal flooding challenges firsthand.

fact_check Site Health Audit

check_circle Structural BMP Integrity Scan
check_circle Soil Erosion Risk Analysis
check_circle Regulatory Compliance Status
check_circle Written Findings & Recommendations

No obligation to hire AUE Land for any service work.