(843) 301-0172
Orlando, FL

Stormwater Management & SJRWMD ERP Compliance in Orlando, FL

Pond and BMP maintenance, drainage well service, erosion control, and dredging engineered for Orange County's karst geology and chain-of-lakes drainage system.

AUE Land stormwater equipment on a drainage job in Orlando, FL

Orlando's stormwater rules run through the St. Johns River Water Management District, and the ground underneath makes the rules matter more.

Orange County and the City of Orlando are regulated under SJRWMD's Environmental Resource Permit (ERP) program, governed by Chapter 62-330 of the Florida Administrative Code. That's a distinct regulatory track from the tidal, MS4-driven coastal counties. SJRWMD reviews stormwater management systems for both water quality treatment and water quantity control before construction, and it holds property owners to the conditions of that permit for as long as the system exists on the ground.

What sets Orange County apart isn't the paperwork, it's the geology underneath it. This is karst country: porous limestone that slowly dissolves as rainwater moves through it, opening voids and sometimes collapsing into sinkholes. Lake Eola, the lake at the center of downtown Orlando, started as a sinkhole in the late 1800s. It's one of more than 100 lakes inside city limits, and the same process built most of them. Sinkholes can open beneath retention ponds, stormwater pipes, and building pads without warning, which is why geotechnical awareness matters as much as hydraulic design on a lot of Orlando sites.

The county's drainage system reflects that geology. Orlando's chain of interconnected lakes handles a large share of the region's stormwater conveyance, but in older parts of the city, the primary system relies on drainage wells that send excess stormwater straight into the aquifer instead of a surface pond. Those wells prevented flooding for decades, and they still do, but they need a different inspection and maintenance approach than a conventional detention basin. A property built around a drainage well doesn't have the same failure signature as one built around a pond, and treating them the same way is how deficiencies get missed.

If you own or manage stormwater infrastructure in the Orlando area, you're carrying:

  • ERP condition compliance for the life of the permitted system, not just the construction phase
  • Routine BMP maintenance including sediment removal, vegetation management, and outlet structure repair
  • Drainage well inspection where the property's system routes to one instead of a surface pond
  • Documentation that demonstrates the system still performs as originally permitted

Orange County's growth hasn't slowed down. The I-Drive and theme park corridor alone has added dense commercial and hospitality development on tight footprints, and every project added another permitted system that now needs upkeep. AUE Land works as a regionally dispatched crew serving Central Florida on a project or scheduled-maintenance basis, mobilizing the equipment and documentation a karst-region ERP requires.

What we do for Orlando properties.

Stormwater SJRWMD Compliance Support

ERP-condition review, BMP inspection scheduling, and compliance documentation for stormwater systems permitted under Chapter 62-330 in Orange County and the City of Orlando. We help property owners keep pace with SJRWMD's inspection expectations.

Stormwater Pond & BMP Maintenance

Sediment removal, outlet structure repair, and vegetation management for the retention and detention ponds that make up Orlando's chain-of-lakes drainage network. Karst-origin ponds carry sediment and vegetation patterns different from a coastal excavated pond.

Pond Dredging

Mechanical and hydraulic dredging for silted-in lakes and stormwater ponds across Orange County's chain-of-lakes system, where decades of urban runoff have shrunk the storage volume some systems were originally permitted for.

Storm Drainage & Drainage Well Service

Catch basin repair, storm pipe replacement, and inspection of the drainage well systems that move stormwater directly into the aquifer in Orlando's older neighborhoods. These systems need a different maintenance approach than a surface pond.

Erosion Control & Bank Stabilization

Pond bank restoration and slope stabilization engineered for karst-adjacent ground, where erosion can accelerate subsurface voids rather than just wash away topsoil. We assess the geology before we pick a stabilization method.

Grading & Earthwork

Site regrading and drainage correction that accounts for Orlando's high water table and karst subsurface. Positive drainage away from known subsidence-prone areas is the goal on every regrading job here.

Emergency Repair

Fast response for washouts, pond bank failures, and drainage structure collapse after Central Florida's intense summer convective storms. We mobilize a crew and the equipment the repair calls for.

Properties we serve in the Orlando area.

HOAs & Planned Communities

Orange County's rooftop growth over the past two decades built hundreds of communities around the region's lakes, many of them permitted stormwater features as much as amenities. We build inspection and maintenance programs that keep those systems compliant with SJRWMD conditions and keep the water features looking like an asset instead of a liability.

Commercial & Hospitality Properties

Hotels, retail centers, and mixed-use development along the I-Drive and theme park corridor operate stormwater systems under some of the tightest site footprints in the state. We handle inspections, sediment removal, and structural repair for commercial property owners and managers who can't afford unplanned downtime around guest-facing areas.

Developers

Orange County's commercial and residential construction market stays active year-round. We perform BMP installation, grading, and erosion control that developers need to close out SJRWMD ERP permit conditions and hand a finished site to the next owner.

Municipal & Institutional

Orange County and City of Orlando public infrastructure, including drainage wells, lake interconnects, and public BMPs, requires ongoing maintenance in a jurisdiction where the karst subsurface adds risk that flat, non-karst counties don't have to plan for. We work with public entities on inspection and repair contracts.

Karst ground asks more of a stormwater contractor than flat coastal terrain does.

A pond that's silting in over sand behaves differently than one sitting over dissolving limestone. Orlando's sinkhole-formed lake system, its drainage wells, and its SJRWMD ERP conditions call for a crew that reads the ground before it picks a repair method, not one applying a coastal playbook to a karst site.

AUE Land dispatches equipment and crews to Central Florida on a project and scheduled-maintenance basis. We scope the work, document it to the standard SJRWMD inspectors expect, and perform the repair with our own equipment rather than handing it to a subcontractor.

Nearby areas we serve.

Ocala, FL

Marion County, split SJRWMD/SWFWMD, Silver Springs protection area

Daytona Beach, FL

Volusia County coastal corridor, about an hour east

Jacksonville, FL

Northeast Florida, full service coverage

Kissimmee, FL

Osceola County, downstream on the Shingle Creek chain of lakes

Winter Park, FL

Orange County, dense lake-adjacent residential development

Frequently Asked Questions

What stormwater regulations apply to properties in Orlando, FL? expand_more
Orange County and the City of Orlando fall under the St. Johns River Water Management District (SJRWMD), which administers Environmental Resource Permits (ERPs) under Chapter 62-330, F.A.C. This is a different regime than the coastal MS4 programs that govern most of Florida's Atlantic beach cities. Under the statewide general permit rule, a project with less than 10 acres of total project area and less than 2 acres of impervious surface can often qualify for a general permit rather than a full individual ERP; larger or more complex sites need an individual permit reviewed by SJRWMD staff.
Why does karst geology matter for stormwater in Orlando? expand_more
Orange County sits on porous limestone that dissolves slowly under acidic rainwater, a process that carved out most of the county's lakes one collapse at a time. Lake Eola, the postcard lake in downtown Orlando, started as a sinkhole in the late 1800s, and it's not the only one. Orlando counts more than 100 lakes within city limits, most with a similar karst origin. That same porosity means stormwater can move through subsurface conduits far faster than a conventional pond-and-pipe system was designed for, and it means a pond bank or a stormwater structure can sit on ground that's more compromised than it looks from the surface.
What is a drainage well and does my property have one? expand_more
In older sections of Orlando, the city relies on drainage wells to move stormwater off the surface fast, sending it into the aquifer rather than to a retention pond. If your property or your HOA's common area sits in one of those older districts, you may be feeding a drainage well instead of a pond, and that changes how the system needs to be inspected and maintained. A clogged or failing drainage well doesn't show up the way a silted-in pond does; it shows up as standing water after storms that used to drain fine. We check for both system types before we recommend a maintenance plan.
Who provides SJRWMD ERP-compliant stormwater maintenance in Orlando? expand_more
AUE Land provides pond and BMP inspection, sediment removal, drainage well and structure maintenance, erosion control, and grading correction for properties across the Orlando metro. We work as a regionally dispatched crew, not a local storefront: projects are scoped, scheduled, and mobilized out of our home base with the equipment the job requires, and we document everything to the standard SJRWMD expects to see at inspection. Site assessments are available before any work is contracted.
Does AUE Land service the I-Drive and theme park commercial corridor? expand_more
Yes. The International Drive and theme park corridor carries some of the densest commercial and hospitality development in the state, and most of it sits on the same karst ground as the rest of the county. Hotels, retail centers, and mixed-use developments along that corridor operate stormwater systems that were often engineered under tight footprints, which makes routine maintenance more important, not less. We take on commercial contracts across Orange County on a project or standing-maintenance basis.

Ready for a site that thrives?

Request a site assessment and we'll evaluate your ponds, drainage wells, and ERP compliance status. No obligation to hire AUE Land for any service work.

fact_check Site Health Audit

check_circle Structural BMP Integrity Scan
check_circle Soil Erosion Risk Analysis
check_circle Regulatory Compliance Status
check_circle Written Findings & Recommendations

No obligation to hire AUE Land for any service work.