(843) 301-0172
County Regulations

Horry County, SC Stormwater Regulations

Horry County operates under a Phase II Small MS4 NPDES permit, with enforcement driven by rapid development in the Myrtle Beach metro area. The county manages stormwater through its Stormwater Management department. State penalties from SCDES reach $10,000 per day, and the county enforces local ordinances covering construction runoff and post-construction BMP maintenance.

verified Last verified: March 2026

Primary source: South Carolina Department of Environmental Services (SCDES)

Quick Reference

Category Details
Regulatory Authority SCDES (state), Horry County Stormwater Management (local), OCRM (coastal)
MS4 Status Phase II Small MS4
Permit Required State: 1 acre+ disturbance (NPDES CGP). County: additional review for development projects
Inspection Frequency Construction: weekly + after 0.5" rain. Post-construction: annual BMP inspections
Penalty Range State: up to $10,000/day per violation
Coastal Designation Yes. Beachfront and tidal areas under OCRM jurisdiction. Includes Grand Strand beaches
Key Municipalities Myrtle Beach, North Myrtle Beach, Conway, Surfside Beach, Loris

Permit Requirements

Horry County follows the state NPDES Construction General Permit (SCR100000) requirement for land disturbance of one acre or more. Given the volume of construction in the Myrtle Beach metro area, SCDES processes a high number of permit applications for Horry County projects annually.

The county reviews stormwater management plans as part of its development approval process. New subdivisions, commercial centers, and resort developments must demonstrate adequate stormwater management before receiving construction approval. Post-construction BMPs must be designed to SCDES standards and maintain water quality and peak flow control.

OCRM permits are required for development within the coastal critical area, which includes beachfront properties, tidal creeks, and marsh areas along the Grand Strand. The City of Myrtle Beach and other beachfront municipalities may have additional permitting requirements for construction near the beach.

Inspection Obligations

Construction site inspections are required at least weekly and within 24 hours of rainfall events producing 0.5 inches or more. With the volume of active construction in Horry County, both self-inspections by permit holders and oversight inspections by county staff occur frequently.

Post-construction BMPs must be inspected annually by the property owner or responsible party. Horry County tracks permitted stormwater facilities and conducts its own compliance inspections. The county's stormwater department focuses on facilities that have been flagged through complaints, previous violations, or age-based risk assessments.

The county's illicit discharge detection program monitors storm sewer outfalls for non-stormwater discharges. Given Horry County's hospitality industry and the seasonal population surge during tourist season, the IDDE program is particularly important for maintaining water quality at beach access points and recreational waterways.

Penalty Structure

SCDES enforces state-level stormwater violations with civil penalties up to $10,000 per day per violation under the SC Pollution Control Act. High-profile violations on large development sites or discharges affecting swimming beaches receive heightened enforcement attention.

Horry County enforces its local stormwater ordinance through notices of violation, compliance orders, and fines. The county's enforcement process starts with notification and a compliance deadline. Failure to correct violations leads to escalated enforcement, potentially including stop-work orders and referral to SCDES.

Construction sites with visible sediment discharge to ditches, creeks, or the Intracoastal Waterway receive immediate attention from both county and state inspectors. The tourism-dependent economy amplifies the consequences of water quality violations.

Key BMPs

Horry County's flat coastal plain, sandy soils, and high water table influence BMP design. Common BMPs include:

  • Wet detention ponds - The standard BMP for residential subdivisions and commercial developments. Horry County has thousands of permitted stormwater ponds across the county.
  • Bioretention systems - Used in commercial and higher-density residential projects. Require underdrains in areas with high water table or poorly draining soils.
  • Swale systems - Common along roadways and in residential developments. Provide conveyance and filtration through vegetated channels.
  • Permeable pavement - Applied in parking areas for commercial and resort properties. Sandy subsoils generally provide good infiltration, but high groundwater can limit effectiveness.
  • Dune and beach management - Specialized BMPs for beachfront properties that address coastal erosion, sand transport, and stormwater discharge to the beach.

Local Ordinances

Horry County's stormwater ordinance implements the requirements of its MS4 permit and addresses the unique challenges of managing rapid development. The ordinance requires stormwater management plans for new development, maintenance agreements for permanent BMPs, and compliance with the county's IDDE program.

The City of Myrtle Beach, North Myrtle Beach, and other municipalities within Horry County have their own stormwater ordinances that may be stricter than county requirements. Projects within municipal limits should verify local standards with the respective city or town.

Horry County's experience with Hurricane Florence (2018), which caused record flooding along the Waccamaw River, has influenced stormwater policy. The county has increased emphasis on flood resilience in development reviews and is updating its stormwater management standards to account for more intense rainfall patterns.

Horry County Stormwater FAQs

How does rapid development in Horry County affect stormwater requirements? expand_more
Horry County is one of the fastest-growing counties in South Carolina, and this growth directly increases stormwater regulatory activity. More construction means more NPDES permits, more erosion control inspections, and more permanent BMPs to maintain. The county and SCDES actively monitor construction sites in the Myrtle Beach metro area. The volume of new subdivisions and commercial development along the US-17, US-501, and SC-31 corridors generates continuous stormwater permitting and inspection obligations.
What is Horry County's MS4 permit and what does it require? expand_more
Horry County holds a Phase II Small MS4 NPDES permit from SCDES. The permit requires six minimum control measures: public education, public involvement, illicit discharge detection and elimination, construction site stormwater runoff control, post-construction stormwater management, and pollution prevention for municipal operations. The county submits annual reports to SCDES documenting implementation of these measures across the urbanized area.
What are stormwater fines in Horry County? expand_more
SCDES can impose civil penalties up to $10,000 per day per violation at the state level. Horry County enforces its local stormwater ordinance with notices of violation, compliance orders, and fines. The county's Stormwater Management department conducts inspections and can require corrective action within specified timeframes. Properties with failing BMPs face enforcement until compliance is achieved.

Ready for a site that thrives?

AUE Land provides BMP inspections, erosion control, and drainage services throughout the Myrtle Beach metro area and greater Horry County.

fact_check Site Health Audit

check_circle Structural BMP Integrity Scan
check_circle Soil Erosion Risk Analysis
check_circle Regulatory Compliance Status
check_circle Written Findings & Recommendations

No obligation to hire AUE Land for any service work.